Campus-by-Campus Project Review
Campus By Campus Proposed Project List
The Carroll School Board called a May 2017 bond election. Voters approved the single-proposition bond program totaling $208 million.
Lifecycle projects are those projects that involve replacement or a refresh like paint, carpet, roofs, HVAC systems, tile, wall coverings, etc.
Elementary
Walnut Grove Elementary (Upgrades & Capacity) - $2,000,000
4-Classroom / Computer Lab Addition
Upgrades to Classrooms
Renovations to Administration Area
Build a Storage area within the Service Yard
Site Work Improvements, Additional Parking, Sidewalks, Fencing, etc…
Technology Upgrades
Safety and Security
Furniture, Fixtures & Equipment (FF&E)
Carroll Elementary - $13,500,000
(Upgrades & Capacity $3,500,000 / Lifecycle $10,000,000)
6-Classroom Addition
New Freezer / Cooler Area for the Kitchen
Upgrades and Renovations to Classrooms and Administration Areas
Additional and Renovate Restrooms
New Stage and Equipment
New 2x2 Ceilings (what are 2X2 acoustical tile ceilings?)
Additional Windows for Existing Classrooms
Redesign the schools within the schools
New Flooring as required
Resurface Interior Walls of corridors, classrooms, etc…
Electrical Upgrades
Improvements to the Exterior Skin of the Building, Roof, Structure, etc…
New Playground Surface
Site work Improvements
Technology Upgrades
Safety and Security
Furniture, Fixtures & Equipment (FF&E)
Johnson Elementary - $13,500,000
(Upgrades & Capacity $4,500,000 / Lifecycle $9,000,000)
6-Classroom Addition
New Gymnasium
Renovate Restrooms
Renovate the Auditorium
Additional and Renovate Custodial Closets
New 2x2 Ceilings
Additional Windows for Existing Classrooms
Redesign the schools within the school (building divided into specific grade-level wings)
New Flooring as required
Resurface Interior Walls of corridors, classrooms, etc…
Electrical Upgrades
Improvements to the Exterior Skin of the Building, Brick Work, etc…
Site work Improvements
Technology Upgrades
Safety and Security
Furniture, Fixtures & Equipment (FF&E)
Rockenbaugh Elementary - $10,000,000
(Upgrades & Capacity $2,000,000 / Lifecycle $8,000,000)
Addition of a New Administration Area at the Front of the building
Renovate Old Administration area into 6 Classrooms / Breakout Spaces
Renovate Restrooms
New 2x2 Ceilings
New Flooring as required
Resurface Interior Walls of corridors, classrooms, etc…
Electrical Upgrades
Fire Alarm Upgrades
Improvements to the Exterior Skin of the Building, Doors, Roof, etc…
New Playground Surface
New Canopy Systems
Site work Improvements
Technology Upgrades
Safety and Security
Furniture, Fixtures & Equipment (FF&E)
Old Union Elementary - $10,000,000
(Upgrades & Capacity $2,000,000 / Lifecycle $8,000,000)
Addition of 6 New Classrooms with the Master plan 10 more Classrooms
Addition of a New Administration Area at the Front of the building
Renovate existing Administration Area into 4 New Classrooms
Upgrades to Classrooms
Renovate Restrooms
New 2x2 Ceilings
New Flooring as Required
Resurface interior Walls of corridors, classrooms, etc…
Electrical Upgrades
Fire Alarm Upgrades
Improvements to the Exterior Skin of the Building, Doors, Roof, etc…
New Playground Surface
New Canopy Systems
Site Work Improvements
New Sound System Equipment
Technology Upgrades
Safety and Security
Furniture, Fixtures & Equipment (FF&E)
Intermediate Schools
Durham Intermediate - $6,000,000
(Upgrades $1,000,000 / Lifecycle $5,000,000)
Upgrade and Renovate Science Labs
Renovate Restrooms
Cafeteria / Stage Improvements
Miscellaneous Interior Renovations
New 2x2 Ceilings
New Flooring as required
Resurface Interior Walls of corridors, classrooms, etc…
New Interior Signage
Electrical Upgrades
HVAC Upgrades
Fire Door Upgrades
Improvements to the Exterior Skin of the Building, Doors, Roof, etc…
Site Work Improvements
Technology Upgrades
Safety and Security
Furniture, Fixtures & Equipment (FF&E)
Eubanks Intermediate - $8,000,000
(Upgrades & Capacity $2,000,000 / Lifecycle $6,000,000)
New Addition to Band / Choir Halls
Miscellaneous Interior Renovations
New 2x2 Ceilings
Resurface Interior Walls of corridors, classrooms, etc…
New Flooring as required
HVAC Upgrades
New Canopy Systems
Site Work Improvements
Technology Upgrades
Safety and Security
Furniture, Fixtures & Equipment (FF&E)
Middle Schools
Dawson Middle School - $6,000,000
(Upgrades $500,000 / Lifecycle $5,500,000)
Renovate Restrooms
Renovations to the Gymnasium
Band/Choir Renovations and Practice Rooms
New 2x2 Ceilings
Resurface Interior Walls of corridors, classrooms, etc…
New Flooring as required
HVAC Upgrades
Improvements to the Exterior Skin of the Building, Doors, Roofs, etc…
New Canopy Systems
New Track with additional drainage system
Turf Field
Site Work Improvements
Technology Upgrades
Safety and Security
Furniture, Fixtures & Equipment (FF&E)
Carroll Middle School - $3,000,000
(Upgrades $2,500,000 / Lifecycle $500,000)
Resurface Interior Walls of corridors, classrooms, etc…
Miscellaneous Interior Renovations
Architectural Interior Acoustical Work
Storage Facility
New Track and Field Renovations
Turf Field
Site Work Improvements
Technology Upgrades
Safety and Security
Furniture, Fixtures & Equipment (FF&E)
Carroll High School - $14,000,000
(Upgrades $3,000,000 / Lifecycle $11,000,000)
Renovate Existing Band Hall Facilities STEM Program
Renovate Science Labs
Renovate Library
Renovate Girls Locker Rooms for Better Security
New Locker Room for Girls Wrestling
Renovate Restrooms
New 2x2 Ceilings
New Flooring as required
Resurface Interior Walls of corridors, classrooms, etc…
Fire Door Upgrades
Improvements to the Exterior Skin of the Building, Brick, Roof, etc…
New Canopy Systems
Upgrades to Baseball and Softball Facilities
Upgrades to Football Field and Track Facilities
Turf Field
Site work Improvements
Technology Upgrades
Safety and Security
Furniture, Fixtures & Equipment (FF&E)
Carroll Senior High - $27,000,000
(Upgrades $8,000,000 / Lifecycle $19,000,000)
Renovate the Existing Auditorium and Support Spaces
Renovate and Repurpose Existing Classrooms
Renovate Student Activity Center and Food Court / Kitchen
Renovate Restrooms
Resurface Interior Walls of corridors, classrooms, etc…
New 2x2 Ceilings
HVAC Upgrades
Improvements to the Exterior Skin of the Building, Doors, Roofs, etc…
New Exterior Skin of the Indoor Workout Facility
Miscellaneous Renovation and Upgrades in Field House / Indoor
New Canopy Systems
Upgrades to Baseball and Softball Facilities
Upgrades to Football Field and Track Facilities
4 Turf Fields
Site Work Improvements
Technology Upgrades
Safety and Security
Furniture, Fixtures & Equipment (FF&E)
New Fine Arts Center - $24,000,000
Auditorium at Carroll Sr High to seat 700
Band Halls
Choir Halls
All related support elements
Aquatics Center - $5,000,000
(Upgrades $500,000 / Lifecycle $4,500,000)
Major Repairs to the Pool
Renovation and Upgrades to Pool Area and Equipment
Renovate and Upgrade of Pool Mechanical Room and Equipment
Renovate Locker Rooms as required
Renovate Concession Area
Lighting Upgrades
Electrical Upgrades
Technology Upgrades
Safety and Security
Furniture, Fixtures & Equipment (FF&E)
Dragon Stadium - $4,000,000
(Upgrades $250,000 / Lifecycle $3,750,000)
Replace Seating on the Home side as required
Renovate Restrooms as required
Resurface Finishes as required
Turf Replacement
Press Box Upgrades
New Graphics as required
Lighting Upgrades
Electrical Upgrades
Fire Alarm Upgrades
Upgrade and Renovate Parking as required
Upgrade and Replace Fencing and Gates as required
Site Work Improvements
Technology Upgrades
Safety and Security
Furniture, Fixtures & Equipment (FF&E)
Transportation Facility - $1,000,000
(Upgrades $300,000 / Lifecycle $700,000)
Miscellaneous Renovations to allow for better use of the Facility
Renovate Restrooms as required
Resurface Finishes as required
Mechanical Upgrades
Lighting Upgrades
Electrical Upgrades
Alarm Upgrades
Upgrade and Renovate Parking as required
Upgrade and Replace Fencing and Gates as required
Site Work Improvements
Technology Upgrades
Safety and Security
Furniture, Fixtures & Equipment (FF&E)
Carroll Administration - $6,000,000
(Upgrades $500,000 / Lifecycle $5,500,000)
Miscellaneous Interior Renovations and Upgrades
Renovate Restrooms
New 2x2 Ceilings
Architectural Interior Acoustical Work
Electrical Upgrades
Plumbing Upgrades
HVAC Upgrades
Improvements to the Exterior Skin of the Building, Roof, etc…
Site Work Improvements
Technology Upgrades
Safety and Security
Furniture, Fixtures & Equipment (FF&E)
District Wide Needs
21st Century Learning Requirements
Artificial Turf
Irrigation Wells
HVAC / Geo-Thermal / Other
LED Lighting
Technology - $45,000,000
Technology (Infrastructure, student devices, classroom furniture, makerspaces, presentation resources)
Buses - $7,500,000
Buses
Other Vehicles
Band - $1,500,000
Instruments for all bands from intermediate campuses through senior high
TOTAL $208,000,000