Campus-by-Campus Project Review

Campus By Campus Proposed Project List

The Carroll School Board called a May 2017 bond election. Voters approved the single-proposition bond program totaling $208 million. 

Lifecycle projects are those projects that involve replacement or a refresh like paint, carpet, roofs, HVAC systems, tile, wall coverings, etc.

Elementary

 

           Walnut Grove Elementary   (Upgrades & Capacity)  - $2,000,000

                          4-Classroom / Computer Lab Addition

                          Upgrades to Classrooms

                          Renovations to Administration Area

                          Build a Storage area within the Service Yard

                          Site Work Improvements, Additional Parking, Sidewalks, Fencing, etc…

                          Technology Upgrades

                          Safety and Security

                          Furniture, Fixtures & Equipment (FF&E)

 

             Carroll Elementary - $13,500,000

                    (Upgrades & Capacity $3,500,000 / Lifecycle $10,000,000)

                          6-Classroom Addition

                         New Freezer / Cooler Area for the Kitchen

                         Upgrades and Renovations to Classrooms and Administration Areas

                         Additional and Renovate Restrooms

                         New Stage and Equipment

                         New 2x2 Ceilings (what are 2X2 acoustical tile ceilings?)

                         Additional Windows for Existing Classrooms

                         Redesign the schools within the schools

                         New Flooring as required

                         Resurface Interior Walls of corridors, classrooms, etc…

                         Electrical Upgrades

                         Improvements to the Exterior Skin of the Building, Roof, Structure, etc…

                         New Playground Surface

                         Site work Improvements

                         Technology Upgrades

                         Safety and Security

                         Furniture, Fixtures & Equipment (FF&E)

 

            Johnson Elementary  - $13,500,000

                     (Upgrades & Capacity $4,500,000 / Lifecycle $9,000,000)

                         6-Classroom Addition

                         New Gymnasium

                         Renovate Restrooms

                         Renovate the Auditorium

                         Additional and Renovate Custodial Closets

                         New 2x2 Ceilings

                         Additional Windows for Existing Classrooms

                         Redesign the schools within the school (building divided into specific grade-level wings)

                         New Flooring as required

                         Resurface Interior Walls of corridors, classrooms, etc…

                         Electrical Upgrades

                         Improvements to the Exterior Skin of the Building, Brick Work, etc…

                         Site work Improvements

                         Technology Upgrades

                         Safety and Security

                         Furniture, Fixtures & Equipment (FF&E)

            

          Rockenbaugh Elementary - $10,000,000

                     (Upgrades & Capacity $2,000,000 / Lifecycle $8,000,000)

                        Addition of a New Administration Area at the Front of the building

                        Renovate Old Administration area into 6 Classrooms / Breakout Spaces

                        Renovate Restrooms

                         New 2x2 Ceilings

                        New Flooring as required

                        Resurface Interior Walls of corridors, classrooms, etc…

                        Electrical Upgrades

                        Fire Alarm Upgrades

                        Improvements to the Exterior Skin of the Building, Doors, Roof, etc…

                         New Playground Surface

                        New Canopy Systems

                        Site work Improvements

                        Technology Upgrades

                        Safety and Security

                        Furniture, Fixtures & Equipment (FF&E)

 

           Old Union Elementary - $10,000,000

                     (Upgrades & Capacity $2,000,000 / Lifecycle $8,000,000)

                          Addition of 6 New Classrooms with the Master plan 10 more Classrooms

                          Addition of a New Administration Area at the Front of the building

                          Renovate existing Administration Area into 4 New Classrooms

                          Upgrades to Classrooms

                          Renovate Restrooms

                          New 2x2 Ceilings

                          New Flooring as Required

                          Resurface interior Walls of corridors, classrooms, etc…

                          Electrical Upgrades

                          Fire Alarm Upgrades

                          Improvements to the Exterior Skin of the Building, Doors, Roof, etc…

                          New Playground Surface

                          New Canopy Systems

                          Site Work Improvements

                          New Sound System Equipment

                          Technology Upgrades

                          Safety and Security

                          Furniture, Fixtures & Equipment (FF&E)

          

Intermediate Schools

 

            Durham Intermediate - $6,000,000

                     (Upgrades $1,000,000 / Lifecycle $5,000,000)

                         Upgrade and Renovate Science Labs

                         Renovate Restrooms

                         Cafeteria / Stage Improvements

                         Miscellaneous Interior Renovations

                         New 2x2 Ceilings

                         New Flooring as required

                         Resurface Interior Walls of corridors, classrooms, etc…

                         New Interior Signage

                         Electrical Upgrades

                         HVAC Upgrades

                         Fire Door Upgrades

                         Improvements to the Exterior Skin of the Building, Doors, Roof, etc…

                         Site Work Improvements

                         Technology Upgrades

                         Safety and Security

                         Furniture, Fixtures & Equipment (FF&E)

                        

            Eubanks Intermediate - $8,000,000

                   (Upgrades & Capacity $2,000,000 / Lifecycle $6,000,000)

                         New Addition to Band / Choir Halls

                         Miscellaneous Interior Renovations

                         New 2x2 Ceilings

                         Resurface Interior Walls of corridors, classrooms, etc…

                         New Flooring as required

                         HVAC Upgrades

                         New Canopy Systems

                         Site Work Improvements

                         Technology Upgrades

                         Safety and Security

                         Furniture, Fixtures & Equipment (FF&E)

           

Middle Schools

 

            Dawson Middle School - $6,000,000

                     (Upgrades $500,000 / Lifecycle $5,500,000)

                         Renovate Restrooms

                         Renovations to the Gymnasium

                         Band/Choir Renovations and Practice Rooms

                         New 2x2 Ceilings

                         Resurface Interior Walls of corridors, classrooms, etc…

                         New Flooring as required

                         HVAC Upgrades

                         Improvements to the Exterior Skin of the Building, Doors, Roofs, etc…

                         New Canopy Systems

                         New Track with additional drainage system

                         Turf Field

                         Site Work Improvements

                         Technology Upgrades

                         Safety and Security

                         Furniture, Fixtures & Equipment (FF&E)

 

               Carroll Middle School  - $3,000,000

                     (Upgrades $2,500,000 / Lifecycle $500,000)                                              

                         Resurface Interior Walls of corridors, classrooms, etc…

                         Miscellaneous Interior Renovations

                         Architectural Interior Acoustical Work

                         Storage Facility

                         New Track and Field Renovations

                         Turf Field

                         Site Work Improvements

                         Technology Upgrades

                         Safety and Security

                         Furniture, Fixtures & Equipment (FF&E)

  

Carroll High School -  $14,000,000

                     (Upgrades $3,000,000 / Lifecycle $11,000,000)

                         Renovate Existing Band Hall Facilities STEM Program

                         Renovate Science Labs

                         Renovate Library

                         Renovate Girls Locker Rooms for Better Security

                         New Locker Room for Girls Wrestling

                         Renovate Restrooms            

                         New 2x2 Ceilings

                         New Flooring as required

                         Resurface Interior Walls of corridors, classrooms, etc…

                         Fire Door Upgrades

                         Improvements to the Exterior Skin of the Building, Brick, Roof, etc…

                         New Canopy Systems

                         Upgrades to Baseball and Softball Facilities

                         Upgrades to Football Field and Track Facilities

                         Turf Field

                         Site work Improvements

                         Technology Upgrades

                         Safety and Security

                         Furniture, Fixtures & Equipment (FF&E)

                               

Carroll Senior High - $27,000,000

                       (Upgrades $8,000,000 / Lifecycle $19,000,000)

                        Renovate the Existing Auditorium and Support Spaces

                        Renovate and Repurpose Existing Classrooms

                        Renovate Student Activity Center and Food Court / Kitchen

                        Renovate Restrooms

                        Resurface Interior Walls of corridors, classrooms, etc…

                        New 2x2 Ceilings

                        HVAC Upgrades

                        Improvements to the Exterior Skin of the Building, Doors, Roofs, etc…

                        New Exterior Skin of the Indoor Workout Facility

                        Miscellaneous Renovation and Upgrades in Field House / Indoor

                        New Canopy Systems

                        Upgrades to Baseball and Softball Facilities

                        Upgrades to Football Field and Track Facilities

                        4 Turf Fields

                        Site Work Improvements

                        Technology Upgrades

                        Safety and Security

                        Furniture, Fixtures & Equipment (FF&E)

 

   New Fine Arts Center  - $24,000,000

                       Auditorium at Carroll Sr High to seat 700

                       Band Halls

                       Choir Halls

                       All related support elements

  

   Aquatics Center  - $5,000,000

                   (Upgrades $500,000 / Lifecycle $4,500,000)

                       Major Repairs to the Pool

                       Renovation and Upgrades to Pool Area and Equipment

                       Renovate and Upgrade of Pool Mechanical Room and Equipment

                       Renovate Locker Rooms as required

                       Renovate Concession Area

                       Lighting Upgrades

                       Electrical Upgrades

                       Technology Upgrades

                       Safety and Security

                       Furniture, Fixtures & Equipment (FF&E)

                   

Dragon Stadium - $4,000,000

                       (Upgrades $250,000 / Lifecycle $3,750,000)

                       Replace Seating on the Home side as required

                       Renovate Restrooms as required

                       Resurface Finishes as required

                       Turf Replacement

                       Press Box Upgrades

                       New Graphics as required

                       Lighting Upgrades

                       Electrical Upgrades

                       Fire Alarm Upgrades

                       Upgrade and Renovate Parking as required

                       Upgrade and Replace Fencing and Gates as required

                       Site Work Improvements

                       Technology Upgrades

                       Safety and Security

                       Furniture, Fixtures & Equipment (FF&E)

 

Transportation Facility - $1,000,000

                       (Upgrades $300,000 / Lifecycle $700,000)

                       Miscellaneous Renovations to allow for better use of the Facility

                       Renovate Restrooms as required

                       Resurface Finishes as required

                       Mechanical Upgrades

                       Lighting Upgrades

                       Electrical Upgrades

                       Alarm Upgrades

                       Upgrade and Renovate Parking as required

                       Upgrade and Replace Fencing and Gates as required

                       Site Work Improvements

                       Technology Upgrades

                       Safety and Security

                       Furniture, Fixtures & Equipment (FF&E)

  

Carroll Administration -  $6,000,000

                    (Upgrades $500,000 / Lifecycle $5,500,000)

                     Miscellaneous Interior Renovations and Upgrades

                     Renovate Restrooms

                     New 2x2 Ceilings

                     Architectural Interior Acoustical Work

                     Electrical Upgrades

                     Plumbing Upgrades

                     HVAC Upgrades

                     Improvements to the Exterior Skin of the Building, Roof, etc…

                     Site Work Improvements

                     Technology Upgrades

                     Safety and Security

                     Furniture, Fixtures & Equipment (FF&E)

 

District Wide Needs

                     21st Century Learning Requirements

                     Artificial Turf

                     Irrigation Wells

                     HVAC / Geo-Thermal / Other

                     LED Lighting   

 

Technology - $45,000,000

                       Technology (Infrastructure, student devices, classroom furniture, makerspaces, presentation resources)         

Buses - $7,500,000

                      Buses

                      Other Vehicles

 

Band - $1,500,000     

                     Instruments for all bands from intermediate campuses through senior high

 

TOTAL $208,000,000