Extracurricular

Extracurricular/Cocurricular Projects

The 2017 Bond Program included extracurricular and cocurricular projects at all secondary campuses. 

Please select from the following project updates:

Completed Extracurricular/Cocurricular Projects

  • Dragon Stadium's green trim has been repainted, along with a fence that has been moved to provide more space to the public. Restrooms accessible to the public during tailgating are planned as part of the Dragon Stadium renovation. NOTE: The rest of the Dragon Stadium project is slated for completion in the Fall of 2019.
  • Four fans were recently installed in the Indoor Workout Facility at Carroll Sr. High School.
  • Bond funds were used to purchase equipment for grounds maintenance.

Back to top


Current/Ongoing Extracurricular/Cocurricular Projects

Baseball/Softball Complex

During a Special Meeting called on November 27, the Board of Trustees approved the contract recommendation for artificial turf installation and other related improvements at CSHS Softball/Baseball complex. See MySouthlakeNews.com story here.

This facility improvement is a part of 2017 Bond Phase I of this complex. The cost of this project will not exceed $1,944,015 and will be paid through Bond funds approved in the 2017 Carroll Bond.

The project includes the installation of artificial turf at the softball and baseball fields. These improvements will lower the maintenance and operational costs for both of the athletic facilities. Also, this project will be able to alleviate some of the scheduling issues that have occurred in the past due to rainouts and other factors. Phase II of this improvement project will begin in the summer of 2018.

This 2017 Carroll Bond project continues to help the district achieve their goal of lowering the overall Carroll ISD operational cost.

On August 21, 2017 the Carroll School Board approved the selection of LPA, Inc. to assist the district in executing this project as required to a successful conclusion. The schedule on this project is critical as it is needing to be accomplished around the usage of the complex.

August 21, 2017 School Board Minutes 

More About LPA, Inc.

Turf Project for Football/Practice Fields

As part of the 2017 Bond, the Capital Needs Planning Committee and Administration reviewed all the competition football fields and tracks. The Committee had a desire to turf seven football fields (3-CSHS, 1- CHS, 1- CMS, 1- DMS, and Dragon Stadium replacement) but after further review and because of cost concerns, the final CNPC recommendation was for only six fields to be turfed. The field that was removed was one of the two adjoining practice fields at CSHS.

As the Administration developed a bid package to be used in the interlocal contract (procurement process), an additional practice football field at CSHS was added to the bid package. The Administration believes this can be done within the allotted budget. The concept was presented to the Bond Advisory Committee on Nov. 28, 2017. The BAC agreed
that it would be the most beneficial to the district to include this additional field in the bid package to be
able to leverage the economy of scale with bidding all seven fields together.

At the December 4, 2017 meeting, the Carroll School Board approved the addition of the seventh field into the bid
package for the CISD football fields to be turfed through the interlocal contract procurement process.

Band Uniforms & Instruments

The Bond Program approved by voters in May 2017 included $1.5 million for band instruments across all band programs, grades 5-12. Also included in the bond package are new uniforms for Band.

Back to top


Future Extracurricular/Cocurricular Projects

Aquatics Center Project

As part of the 2017 Bond, the Aquatics Center at Carroll Sr. High School will have renovations and upgrades. This project requires a professional consultant to be hired by the district to design and assist the district throughout the completion of the project. This project has been categorized as a Type 3 project, and needs to be scheduled so as to have minimal disruption of the facility. This project will require a design team that has a strong portfolio in designing aquatics facilities. Trustees have not yet voted on the architect for this project, which is expected to be completed by the Fall of 2019.

Various aspects of the Aquatics Center project include:

  • Major Repairs to the Pool
  • Renovation and Upgrades to Pool Area and Equipment
  • Renovate and Upgrade of Pool Mechanical Room and Equipment
  • Renovate Locker Rooms as required
  • Renovate Concession Area
  • Lighting Upgrades
  • Electrical Upgrades
  • Technology Upgrades
  • Safety and Security
  • Furniture, Fixtures & Equipment (FF&E)

Dragon Stadium Project

As part of the 2017 Bond Program, Dragon Stadium will undergo $4 million in renovations and upgrades. This project has been designed a Type 2 project, and will require an architect to be hired by the district. The architect will design and assist the district throughout the completion of the project. To date, no architect has been selected. The project is expected to be completed in the Fall of 2019.

Various renovations/upgrades planned for Dragon Stadium include: 

  • Replace Seating on the Home side as required
  • Renovate Restrooms as required
  • Resurface Finishes as required
  • Turf Replacement
  • Press Box Upgrades
  • New Graphics as required
  • Lighting Upgrades
  • Electrical Upgrades
  • Fire Alarm Upgrades
  • Upgrade and Renovate Parking as required
  • Upgrade and Replace Fencing and Gates as required
  • Site Work Improvements
  • Technology Upgrades
  • Safety and Security
  • Furniture, Fixtures & Equipment (FF&E)